At 94.5 km of Provincial Highway 8, slope collapse is being repaired by the Highway Bureau
Keywords: Provincial Highway 8, Taichung City, Highway Bureau, Guguan Highway Maintenance Section, Taipower, Heping District
Back to News List
Tuesday, 05 August 2025
At 94.5 km of Provincial Highway 8 in Heping District, Taichung City, due to continuous rainfall, a large-scale slope collapse occurred, causing traffic to be interrupted. After receiving the report, the Guguan Highway Maintenance Section of the Highway Bureau immediately blocked the site and sent machinery to the site on the 5th for repairs. It is currently expected that traffic will resume at 5 p.m. today. To cope with the traffic disruption, two additional trips have been added on the Zhongheng alternative route, facilitating the transportation of vegetables and fruits for residents and farmers in Lishan.
