Auckland Airport Faces Fog Challenges; Flights Delayed and Cancelled

Keywords: Auckland Airport, fog, flight delays, flight cancellations, weather disruptions, travel troubles, NZ947, NZ291, Met Service, flight updates
Back to News List
Monday, 14 July 2025

Auckland Airport faced significant disruptions on Monday morning as dense fog forced multiple flights to make second landing attempts, with several domestic flights cancelled due to the poor visibility.

Two flights, NZ947 from Rarotonga and NZ291 from Bali, both required a second attempt to land, highlighting the challenges posed by the early morning fog. The airport issued an update at 6:40 a.m., stating that four domestic regional flights had been cancelled. These include NZ5201 to Blenheim, NZ5091 to Taupō, NZ5151 to Rotorua, and NZ5163 to Gisborne. All these flights are currently marked as cancelled on the airport’s website.

Despite the disruptions, the main trunk domestic flights and international flights have not been affected yet. However, passengers are advised to check the airport’s website, aucklandairport.co.nz, for the latest updates on arrivals and departures.

The Met Service reported that the fog is expected to lift by the morning, though scattered showers are anticipated in the area. This means that while the worst of the weather may be over, travelers should remain cautious and check for any last-minute changes.

Such weather-related disruptions are not uncommon, but they can cause significant inconvenience for passengers. Airlines and airports often have contingency plans in place, but the unpredictable nature of weather can still lead to delays and cancellations.

As the situation continues to evolve, it's essential for travelers to stay informed and plan accordingly. With the airport working to manage the delays, it's hoped that the impact on passengers will be minimized.

The incident underscores the importance of real-time updates and communication between airlines, airports, and passengers. As technology advances, the hope is that such disruptions will become less frequent and easier to manage.

0.044706s